Free tool
Safety stock is the extra inventory you keep so a demand spike or a late delivery does not leave you with empty shelves. Enter your numbers to get the amount, the reorder point and the maths behind it.

Safety stock is the cushion of inventory you hold on top of the stock you expect to sell while waiting for a delivery. If you sell 6 units a day and your supplier takes 10 days, you expect to sell 60 units before the order arrives. Safety stock covers the case where you sell more than that, or the order takes longer.
Statistical method
Safety stock = z x square root of (lead time x demand variance + average demand squared x lead time variance). Here z is the number of standard deviations that matches the chance you accept of not running out, demand variance is the squared standard deviation of daily sales, and lead time variance is the squared standard deviation of your delivery times in days.
Common z values are 1.28 for a 90 percent service level, 1.65 for 95 percent, 1.96 for 97.5 percent and 2.33 for 99 percent. It assumes demand and lead time vary independently and roughly follow a bell curve, so treat it as a guide for steady products, not for launches or promotions.
Max minus average method
Safety stock = highest daily sales x longest lead time - average daily sales x average lead time. It is simple and conservative, because it assumes your worst sales day meets your worst delivery. It tends to give a larger number than the statistical method.
Say a product sells 6 units a day on average with a standard deviation of 2.5 units, and the supplier takes 10 days with a standard deviation of 2 days. At a 95 percent service level, safety stock = 1.65 x square root of (10 x 6.25 + 36 x 4) = 1.65 x 14.4 = about 24 units. The reorder point is 6 x 10 + 24 = 84 units.
With the max minus average method, if the best day sold 11 units and the slowest delivery took 17 days, safety stock = 11 x 17 - 6 x 10 = 127 units. The gap between 24 and 127 is the price of certainty: a safer answer ties up far more cash.
Export daily units sold for the last 60 to 90 days and use a spreadsheet function such as STDEV on the daily column to get the spread of sales. For lead time, write down the days from order placed to stock on your shelf for your last five or more deliveries, then take the average and the standard deviation. Strip out one-off bulk orders and flash sales first, or they will inflate the answer.
Using the supplierโs quoted lead time instead of real deliveries. Using a single month of data for a seasonal product. Setting the same safety stock for every product instead of one per product. Forgetting to recalculate when a campaign changes your sales speed.
What is a good safety stock level?
There is no universal number. It depends on how variable your demand and delivery times are and how costly a stockout is. Many stores aim for a 95 percent service level on bestsellers and accept a lower one on slow products.
Is safety stock the same as the reorder point?
No. The reorder point is the stock level that triggers an order. It equals the demand you expect during the lead time plus the safety stock.