Free tool

Order quantity calculator (with MOQ and EOQ)

Order quantity calculator (with MOQ and EOQ)

How many units to order now, rounded to full cases and checked against your supplierโ€™s minimum. Shows the cash it ties up and the EOQ for reference.

Order quantity calculator
How many units to order now, after case packs and your supplier's minimum.
Your sales and stock
Timing
Order placed to stock on your shelf
Extra days of sales you want to hold
How long this order should last once it lands
Supplier terms
Units per carton. Use 1 if you can order singles
Use 0 if there is none
For the EOQ reference
Storage, capital and shrink, as % of unit cost a year
Admin, inbound freight setup and receiving per order
Order now
400units
MOQ sets the quantity
Your plan needs 324. The MOQ adds 76 units: about 7.6 extra days of cover and $456 more cash tied up.
Plan, order and EOQ in units
What the plan needs, before rounding320
Rounded to case pack, cases of 12324
This order, MOQ 400400
EOQ, for reference552
EOQ balances ordering cost against holding cost. In practice MOQs, case packs and price breaks usually decide the number.
Cash needed
$2,400
400 units at $6.00
Cover after it lands
45 days
stock left at arrival plus this order
Daily sales
10.0
units a day
Stock at arrival
50
before this order lands
Free tool by Tenpo. It runs in your browser: nothing you type is saved or sent anywhere.

How the calculation works

How the calculation works

Daily sales = units sold in the last 30 days / 30. Units needed = daily sales x (lead time + safety buffer + days of cover after delivery) - stock on hand - stock on order. That is rounded up to full case packs. If the result is below the supplierโ€™s MOQ, you order the MOQ, and the extra units add days of cover and tie up cash.

EOQ, the economic order quantity, is the square root of (2 x annual demand x cost per order / yearly holding cost per unit). It balances the cost of placing orders against the cost of holding stock. It is shown for reference only, because MOQs, case packs and price breaks usually decide the real number.

Worked example

Worked example

A product sells 300 units in 30 days, so 10 a day. Lead time is 21 days, the buffer is 7 days and you want 30 days of cover after delivery: 58 days, or 580 units. You have 260 on hand, so you need 320. In cases of 12 that rounds up to 324.

The supplierโ€™s MOQ is 400, so you order 400. That is 76 units over plan: about 7.6 extra days of cover and $456 more cash at $6 a unit. The order costs $2,400 and, with 50 units left when it lands, covers about 45 days. With a $50 cost per order and a 20 percent holding cost, EOQ is about 552 units.

Questions

Questions

Should I order the EOQ instead?

Usually not on its own. EOQ assumes steady demand and no minimums or price breaks. Use it as a sense check: if your orders are far smaller than EOQ, ordering less often may save money; if they are far larger, you may be tying up cash.

What if the MOQ is much larger than I need?

Look at how many extra days of cover it buys and how much cash it ties up. If that is months of stock, ask the supplier for a lower MOQ, a mixed-SKU order, or a smaller quantity at a higher unit price.

Why does it warn that I run out before the order arrives?

Your stock on hand and on order will not last through the lead time. Ask the supplier to ship faster, split off a small air shipment, or slow sales on that product until the order lands.

Abstract Image
Abstract Image
Abstract Image
Abstract Image

Ready to hire your
first AI agent?

Automate your store ops with Tenpo AI today

Abstract Image
Abstract Image
Abstract Image
Logo
Abstract Image
Abstract Image
Abstract Image
Abstract Image

Ready to hire your
first AI agent?

Automate your store ops with Tenpo AI today

Abstract Image
Abstract Image
Abstract Image
Logo
Abstract Image
Abstract Image
Abstract Image
Abstract Image

Ready to hire your
first AI agent?

Sixty seconds and a token.

Nothing moves

without your tap.

Abstract Image
Abstract Image
Abstract Image
Logo